Stowfield Cable Works Stowfield 13,537 - 53,752 SF of Space Available in Lydbrook GL17 9NG



HIGHLIGHTS
- Recently refurbsihed units
- Units can be fitted according to bespoke occupier requirements.
- Situated on the B4234 within 10 minutes of the A40 dual carriageway link to the motorway system (M50 and M4).
- Various logistics, industrial and office accommodation within historic industrial site re-invented for modern requirements.
- Uses include logistics, storage, processing and office accommodation.
FEATURES
ALL AVAILABLE SPACES(2)
Display Rental Rate as
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
Suitable uses include logistics, storage, processing and office accommodation. Units can be fitted according to bespoke occupier requirements.
- Use Class: E
- Security System
- Reception Area
- Natural Light
Suitable uses include logistics, storage, processing and office accommodation. Units can be fitted according to bespoke occupier requirements.
- Use Class: E
- Security System
- Reception Area
- Natural Light
Space | Size | Term | Rental Rate | Space Use | Condition | Available |
Ground, Ste 1 | 40,215 SF | 24 Years | $10.10 CAD/SF/YR | Office/Retail | - | Now |
Ground - 2A2 | 13,537 SF | Negotiable | $9.18 CAD/SF/YR | Industrial | - | 30 Days |
Ground, Ste 1
Size |
40,215 SF |
Term |
24 Years |
Rental Rate |
$10.10 CAD/SF/YR |
Space Use |
Office/Retail |
Condition |
- |
Available |
Now |
Ground - 2A2
Size |
13,537 SF |
Term |
Negotiable |
Rental Rate |
$9.18 CAD/SF/YR |
Space Use |
Industrial |
Condition |
- |
Available |
30 Days |
PROPERTY OVERVIEW
Stowfield Cable Works is a historic industrial site re-invented for modern requirements. The site, previously used to manufacture much of the British Army’s telephone cable in WWI and part of the Pluto Pipeline in WWII, comprises 30,299 sq m (326,150 sq ft) of industrial and office buildings. Suitable uses include logistics, storage, processing and office accommodation. Units can be fitted according to bespoke occupier requirements. The site is currently in the process of jhaving over 350 kWp of solar power installed, which is expected to make a significant contribution to occupier’s electricity consumption and in turn will reduce the site’s carbon footprint.