This feature is unavailable at the moment.
We apologize, but the feature you are trying to access is currently unavailable. We are aware of this issue and our team is working hard to resolve the matter.
Please check back in a few minutes. We apologize for the inconvenience.
- LoopNet Team
thank you
Your email has been sent!
18385 PA-287 - 3.25 MW POWER READY INDUSTRIAL SITE
12 Acres of Industrial Land in Tioga, PA 16946
Investment Highlights
- 3.25 MW OF IN-PLACE POWER CAPACITY (2.25 MW ENERGIZED)
- APPROVED FOR 100 MW OF POWER CAPACITY EXPANSION
- IDEAL BITCOIN MINING // HOSTING SITE – UTILITY APPROVED
- 12 AC OF HEAVY INDUSTRIAL ZONED LAND with LARGE POURED SLAB AREA
- TRANSMISSION LOAD STUDY COMPLETED BY FIRST ENERGY
Property Facts
1 Lot Available
Lot
Lot Size | 12.00 AC |
Lot Size | 12.00 AC |
Description
HEAVY POWER SITE FOR INDUSTRIAL, MANUFACTURING & BITCOIN MINING - TURNKEY & POWER READY!! Former Georgia-Pacific processing facility. Currently being operated as a bitcoin mining site with 2.25 MW of 3.25 MW energized. Transformers on for all 3.25 MW are on site and included in the sale. Estimated power cost is $0.045 KWH, billed as actual. POWER-LOAD CAPACITY EXPANSION: Fully Approved by FirstEnergy (Penn Electric) for 100 MW. Transmission Load Study has been completed. Utility Substation is 1.4 miles away. Utility will bring 115kV high-voltage line to the site. Utility has no must-takes, power billed as actual. PA is deregulated therefore power blocks can be purchased on open market. Estimated power cost is $0.045 KWH - contracted capacity will directly impact power cost.
zoning
Zoning Code | Industrial |
Industrial |
Presented by
18385 PA-287 - 3.25 MW POWER READY INDUSTRIAL SITE
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.